Monday, January 12, 2015

Day 10

Day nine was a Sunday, and thus there was no blog post, as we had the day off.

Today, though, was a Monday, so we got right to work.

Preliminary design decisions made, we broke the team off into sub teams, first assigning veterans to sub team lead positions for the claw, drive base, forklift, elevator, roller intake, and programming.
As those words probably mean nothing to most people, here's a rough diagram of what they mean on our robot. (These will be the words I use to refer to each system from here on out).

Behold my beautiful drawing skills.

We will be continuing design for the rest of the week and Cad-ing.

We hope to have some parts ready to be sent off to be machined soon.

GO ROBOTOTES!